国产韩国精品一区二区三区久久,日本欧美视频在线,国产三级小视频在线播放完整版

welcome to visit the official website of SynWin Environmental Group Co., Ltd . !
Pre-sales service :+86-755-82997309 After -sales service :+86-760-88772310
Location: Home >> NEWS >> Corporate News
NEWS

Project Case | Transformation of Domestic Wastewater Treatment Plant into Industrial Wastewater Treatment Plant

Date:2023-10-08 20:16:06 Views:0


The first sewage treatment plant of Yangjiang High tech Zone is located in Fugang Industrial Park, Yangjiang High tech Zone, with a discharge outlet set up on the Jiangxi River in Moyang. The total design scale of the project is 50000 tons per day, divided into three phases of construction, responsible for treating domestic and industrial wastewater in Fukuoka Park. The park's enterprises mainly focus on food processing and hardware and electronics industries.

The first phase of construction has a scale of 10000 tons per day, designed according to the proportion of 30% industrial wastewater and 70% domestic sewage, and was put into commercial operation in November 2011.

After 12 years of development and changes, the actual treated water volume of the industrial park has increased from an initial average of 1000 tons/day to an average of 8000 tons/day; The actual proportion of industrial wastewater to domestic wastewater has increased from 30/70 to 70/30; The actual inflow water quality COD/TN/TP has changed from the initial 200/30/4 to 500/70/10; The water quality of the effluent has also been increased from Grade B to Grade A; Only through technological transformation can sewage treatment plants ensure long-term stability and compliance.

With the support of the Yangjiang Municipal Party Committee, Municipal Government, and High tech Zone Management Committee, the technical renovation project started in November 2022 and was completed and officially put into commercial operation in July 2023. After the technological transformation, the newly built facilities of the sewage treatment plant are seamlessly integrated with the existing facilities and operate in a coordinated manner. The sewage treatment fee is controlled within 3.5 yuan/ton, which is efficient and energy-saving, and the effluent quality is stable and meets the standard. It is a demonstration project for the transformation of industrial park domestic sewage treatment plants into industrial sewage treatment plants.

1703506609905376.jpg

Before technical renovation

1703506682411944.png

After technical renovation

  1. <li id="jcda8"></li>
  2. <span id="jcda8"><table id="jcda8"></table></span>
    <bdo id="jcda8"></bdo>
    1. <span id="jcda8"><input id="jcda8"></input></span>
    • 主站蜘蛛池模板: 佛坪县| 壶关县| 三亚市| 漠河县| 舞阳县| 嵊泗县| 丹阳市| 静海县| 永顺县| 安丘市| 桦南县| 增城市| 太原市| 秦安县| 南雄市| 紫阳县| 黎城县| 德惠市| 沁阳市| 确山县| 西吉县| 昆明市| 和田市| 读书| 洞头县| 泾川县| 凌源市| 岳普湖县| 漳州市| 大关县| 大足县| 东山县| 正宁县| 兖州市| 甘谷县| 莱西市| 资阳市| 疏附县| 石台县| 美姑县| 曲周县|